Thane Metro Line 4 Progress Update

First metro trains arrive in Thane by year-end 2025.

Enquire Now

Thane Metro Line 4: On Track for December 2025 Launch

<p>The Mumbai Metropolitan Region Development Authority (MMRDA) has successfully completed the technical inspection and trial run of Phase 1 for the Thane-Wadala Metro Line 4. This milestone marks a turning point for Thane's connectivity and real estate landscape.</p>

<p>The priority section covers 4.4 km and four stations — Gaimukh, Govaniwada, Kasarvadavli, and Vijay Garden — and is set to open in December 2025. The entire Phase-1 stretch to Cadbury Junction will be operational by April 2026. This phased rollout brings metro connectivity to key Ghodbunder Road neighborhoods in stages, directly benefiting commuters and property investors.</p>

<p>Metro line 4 connects Wadala to Kasarvadavali across 32 km and is the largest segment of this elevated corridor. The metro line 4 completion date for the first section (Cadbury Junction to Gaimukh) is set for late 2025, with the full Wadala-Kasarvadavali route expected by August 2026. Once fully operational, this corridor will drastically reduce commute times for daily travelers.</p>

<p>According to the Mumbai Metropolitan Region, the metro project will significantly reduce travel time from Thane to South Mumbai in less than 45 minutes. For professionals working in South Mumbai's financial districts and business parks, this represents a transformative shift from the current 90-minute commutes via bus or road.</p>

<p>Property prices within a 1 km radius of metro stations have seen a 15-20% jump in the last 2 years, and this is expected to increase further. Ghodbunder Road, already emerging as Thane's growth corridor, is positioned to see accelerated appreciation. The annual price appreciation in Thane is both remarkable and strong across the micro-markets and is the result of expanding infrastructure, improving metro connectivity, and an influx of working professionals.</p>

<p>Despite these temporary setbacks, the Ring Metro—integrating with existing lines like Metro 4 (Wadala–Kasarvadavali) and Metro 5 (Thane–Bhiwandi–Kalyan)—is viewed as the essential backbone for Thane's future mobility. The multi-line metro ecosystem under development positions Thane as Mumbai's next integrated transit hub, creating significant long-term value for real estate investors and residents alike.</p>

Thane Metro Line 4 Update - photo 2

SOBHA Projects

SOBHA Bliss City
Upcoming

SOBHA Bliss City

Kunnumpuram, Kakkanad, Kochi

Mixed-Use: Residential, Commercial & Institutional • Price on request

31.43-acre mixed-use metro township

SOBHA Chandivali
Upcoming

SOBHA Chandivali

Chandivali, Andheri East, Mumbai

2, 3, 4 BHK • Rs 2.70 Cr onwards

Upcoming SOBHA address between Powai & Andheri

SOBHA CODENAME RIVER EDGE
Upcoming

SOBHA CODENAME RIVER EDGE

Feroke, Kozhikode

3, 4 BHK (Expected) • Price on Request

Riverfront address on the Chaliyar

SOBHA RAJENDRA NAGAR
Upcoming

SOBHA RAJENDRA NAGAR

Rajendra Nagar, Hyderabad

2, 3, 4 BHK • Price on Request

Upcoming SOBHA address in South Hyderabad

SOBHA REALTY FRISCO
Upcoming

SOBHA REALTY FRISCO

PGA Parkway District, Frisco

TBA • Price on request

100-acre luxury residential community

SOBHA SECTOR 150 NOIDA
Upcoming

SOBHA SECTOR 150 NOIDA

Sector 150, Noida

2, 3, 4 BHK • Price on request

Upcoming Sobha address in Noida's greenest sector

SOBHA SECTOR 73 GURGAON
Upcoming

SOBHA SECTOR 73 GURGAON

Sector 73, Gurgaon

2, 3, 4 BHK • Price on Request

Upcoming luxury homes on SPR

SOBHA SECTOR 97 NOIDA
Upcoming

SOBHA SECTOR 97 NOIDA

Sector 97, Noida

2, 3, 4 BHK • Price on Request

SOBHA's upcoming address on Noida Expressway

Get In Touch

Request a Callback

Back

Questions, Answered

When will Thane Metro Line 4 start operating?
The priority section with four stations (Gaimukh, Govaniwada, Kasarvadavli, Vijay Garden) opens in December 2025, with the entire Phase-1 stretch to Cadbury Junction operational by April 2026.
How much will travel time to Mumbai reduce with Metro Line 4?
The metro project will significantly reduce travel time from Thane to South Mumbai in less than 45 minutes. This represents roughly 50% reduction compared to current road and bus commutes.
Which Ghodbunder Road localities will be connected by the metro?
Metro Line 4 is a 32 km stretch that will connect Ghodbunder Road directly to South Mumbai (Wadala). Major stops like Kasarvadavali, Vijay Garden, and Kapurbawdi have been included.
What are the four priority stations opening in December 2025?
The priority section covers 4.4 km and four stations — Gaimukh, Govaniwada, Kasarvadavli, and Vijay Garden — and is set to open in December 2025.
How will Metro Line 4 impact property values in Ghodbunder?
Property prices within a 1 km radius of metro stations have seen a 15-20% jump in the last 2 years, and this is expected to increase further. Ghodbunder Road's proximity to multiple stations positions it for significant appreciation.
What is the total length of Metro Line 4?
Metro line 4 connects Wadala to Kasarvadavali across 32 km and is the largest segment of this elevated corridor. The complete corridor will serve over a million daily commuters once operational.
Will there be other metro lines connecting Thane soon?
The Ring Metro—integrating with existing lines like Metro 4 (Wadala–Kasarvadavali) and Metro 5 (Thane–Bhiwandi–Kalyan)—is viewed as the essential backbone for Thane's future mobility. Multiple lines will create redundancy and faster travel options.
What does the full project timeline look like?
Metro Line 4, which runs from Wadala to Kasarvadavali, will be finished in August 2026. The phased approach ensures trials and safety certifications are completed before full passenger service.
Is the metro corridor fully elevated or underground?
The 57.18 km-long completely elevated Green Line Metro Station (Lines 4, 4A, 10, and 11) is now under construction. The elevated design enables faster construction and reduces environmental disruption underground.
What other infrastructure projects complement Metro Line 4?
Key projects include the Balkum-Gaimukh Coastal Road (INR 3,364.62 crore) and the Thane-Borivali Tunnel (INR 16,600.40 crore), alongside flyovers on Ghodbunder Road and Eastern Freeway extension (INR 2,900 crore). This integrated approach creates a comprehensive mobility solution.

This site is published for general information only and is not an offer or contract. Prices, plans, and specifications are indicative and may change without notice. Buyers should verify all details independently before deciding. About · Projects